Pre-implementation analysis brings structure to processes, requirements, data, integrations and responsibilities before an organisation signs a contract or begins a costly implementation of a new IT system.
An ERP, CRM, WMS, document management system, AI solution or custom application implementation usually begins with a business need. A company wants to reduce manual work, shorten processing times, connect multiple systems, improve control over a process or replace a solution that no longer meets the scale of its operations.
Problems arise when this general need is turned into a request for proposals too quickly. The organisation provides only a few sentences of description, vendors prepare their offers based on their own assumptions, and detailed decisions are postponed until the implementation phase.
At first, this may seem like a faster way to start the project. In practice, it often leads to inconsistent estimates, scope disputes, additional costs and situations where each party has a different understanding of the expected outcome.
A good pre-implementation analysis is not a document created simply to be filed away. Its purpose is to establish what should be implemented, why, for whom, within what scope and how we will determine whether the solution works correctly.
Facing a similar challenge and want to bring it under control?
What is a pre-implementation analysis?
A pre-implementation analysis structures the knowledge required to plan and carry out a system implementation. It combines business, process and technical perspectives.
Among other things, it should establish:
- what business problem needs to be solved,
- how the organisation works today,
- what the target process should look like,
- who participates in the process and makes decisions,
- what data is required,
- which systems will participate in the solution,
- which integrations are required,
- what requirements the system must meet,
- how exceptions and errors will be handled,
- how the solution will be tested and accepted,
- how the implementation should be divided into manageable stages.
The analysis does not need to describe every screen and every field from the outset. The appropriate level of detail depends on the purpose of the project, the method used to select the implementation partner and the risks associated with the implementation.
A company selecting a standard system for a dozen users requires a different level of analysis from an organisation implementing a solution across multiple departments, with integrations, data migration and several delivery partners.
When is a pre-implementation analysis needed?
Not every implementation requires months of analysis. If a company is choosing a simple tool, intends to use mainly standard functionality and does not require complex integrations, a short assessment of its needs followed by proper configuration may be sufficient.
A more comprehensive analysis becomes particularly important when:
- the project involves several departments or locations,
- the system will support a key organisational process,
- the process involves multiple roles, approvals and exceptions,
- the solution must exchange data with other systems,
- data migration is planned,
- standard configuration may not cover all requirements,
- the organisation is preparing an RFP or procurement process,
- the implementation partner has won the project but the details of the process have not yet been agreed,
- the project is already underway but scope disputes are emerging,
- the cost of a wrong decision may be significantly higher than the cost of preparing the analysis.
An analysis may therefore be carried out before selecting a system, before selecting an implementation partner, after the contract has been signed or while recovering a project that has run into difficulties. In each case, however, its objective will be slightly different.
| Project stage | Main objective of the analysis |
|---|---|
| Before selecting a system | Define needs and compare possible solution options |
| Before selecting an implementation partner | Prepare a scope that can be estimated reliably |
| After selecting an implementation partner | Clarify processes, configuration, integrations and delivery stages |
| During a difficult implementation | Distinguish defects, configuration gaps, missing requirements and scope changes |
Facing a similar challenge and want to bring it under control?
Start with the business objective, then select the system
The analysis should not begin with a list of features available in a particular product. The first step is to determine what outcome the organisation wants to achieve.
General statements such as “we need a new ERP”, “we want an electronic document workflow” or “we need to implement AI” do not yet define a project objective.
The objective should relate to a problem or a measurable change. For example, it may be:
- reducing repeated manual entry of the same data,
- shortening application processing time,
- providing visibility of the current case status,
- automatically transferring data between systems,
- reducing the number of documents handled outside the system,
- bringing structure to the approval process,
- reducing errors caused by manual work,
- preparing the organisation to handle a larger number of customers or cases,
- obtaining the data required for reporting and decision-making.
Only once the objective has been defined can the organisation determine whether it needs a new system, an extension of the existing solution, an additional integration, a change to the process or simply better use of functionality it already has.
A system demonstration shows what the product can do. A pre-implementation analysis determines what the organisation actually needs.
Who should participate in the analysis?
Knowledge about a process rarely exists in one place. Management understands the organisation’s objectives and constraints, employees understand how work is actually performed, the IT team understands the systems and infrastructure, and the implementation partner understands the capabilities of the proposed solution.
Depending on the project, participants may include:
- the project sponsor or business owner,
- owners of the processes being analysed,
- heads of organisational units,
- employees performing day-to-day activities,
- the IT department and system administrators,
- information security and data protection teams,
- finance, HR, logistics or other domain teams,
- representatives of the implementation partner,
- the analyst facilitating workshops and preparing documentation.
The analyst should not make subject-matter decisions on behalf of the relevant experts. Their role is to gather knowledge, identify ambiguities, structure the available options and document decisions in a way that both the organisation and the implementation partner can understand.
AS-IS process map: how does the organisation work today?
One of the first deliverables of the analysis may be a map of the current process, usually referred to as the AS-IS process. Its purpose is not to present an ideal procedure but to show how work is actually performed.
A process described in a policy or procedure may differ from the process followed by employees in practice. Some activities may take place through email, spreadsheets, telephone calls or notes stored outside the main system.
An internal request to purchase a product or service is a good example.
In the current process, an employee emails a request to their manager. Once approved, the document is forwarded to finance and then to the procurement team. Status is checked through further emails and telephone calls, while the same data is re-entered into a spreadsheet and the financial system.
When analysing the current process, it is useful to establish:
- what triggers the process,
- who performs each activity,
- what data and documents are required,
- where information is stored,
- how many times the same data is re-entered,
- where waiting time and bottlenecks occur,
- which decisions require approval,
- how exceptions are handled,
- how employees check the current status,
- which errors and problems occur most frequently.
An AS-IS map should not become an exact record of every movement an employee makes. Its level of detail should be sufficient to understand the process, problems and dependencies that matter for the system being designed.
TO-BE process: how should work look after implementation?
The target process, or TO-BE process, should not simply reproduce the current steps inside a new system. An implementation is an opportunity to eliminate unnecessary activities, clarify responsibilities and automate selected stages.
Using the purchase request example, the target process could look as follows:
- the employee completes a form in the portal,
- the system checks that all required data has been provided,
- the request receives a unique number and status,
- the approval path is selected based on the amount, category and organisational unit,
- the manager approves, rejects or returns the request for additional information,
- finance confirms budget availability,
- the approved request is transferred to the procurement team or ERP system,
- the fulfilment status is returned to the portal,
- the requester receives notifications about status changes,
- the decision history remains available for audit and reporting purposes.
The target process should show more than just the sequence of activities. It should also define:
- roles and responsibilities,
- decision conditions,
- required data,
- process statuses,
- events that trigger subsequent steps,
- integrations with other solutions,
- messages and notifications for users,
- handling of exceptional situations.
From process to functional requirements
A process map is not yet a complete system specification. It needs to be translated into requirements describing how the solution should behave.
A weak requirement might read:
The system shall support purchase requests.
This statement does not tell the implementation partner what data the request contains, who approves it, what should happen after approval or how exceptional situations should be handled.
A more useful description might look like this:
When a complete request is saved, the system assigns it a unique number and the status “Awaiting approval”.
The approval path is selected based on the value of the request, organisational unit and purchase category.
The approver may approve the request, reject it or return it for completion with a mandatory comment.
Once all required approvals have been obtained, the system transfers the request data to the ERP system.
The ERP system returns either the identifier of the created purchase requisition or an error description. Retrying the operation must not create a duplicate.
The current fulfilment status is visible to the requester and to users participating in the process.
Based on such a description, the implementation partner can determine whether the requirement can be covered by standard configuration or whether a system extension or additional integration is required.
A good requirement should be:
- unambiguous,
- verifiable,
- linked to the process and business objective,
- understandable to both the organisation and the implementation partner,
- detailed enough to support estimation and testing.
Planning an implementation and want to bring structure to the scope?
Data and integrations need clear ownership
In projects involving multiple systems, one of the most important questions is which system is the source of each type of data.
The organisation should establish, among other things:
- which system maintains employee, customer, product or organisational-unit data,
- which system is allowed to modify the data,
- which systems only read the information,
- how frequently the data is synchronised,
- what triggers the data exchange,
- how records are identified,
- how errors and retries are handled,
- how duplicate records are prevented,
- what status is returned to the source system,
- who is responsible for resolving operational problems.
Simply stating that systems should be “connected through an API” does not define an integration. An API is a technical mechanism. The project still needs to define the process, data, communication directions, responsibilities and expected outcome.
Non-functional requirements cannot be left until the end
Organisations often focus on functionality visible to users. However, the usefulness of a solution is also determined by its non-functional requirements.
These may include:
- the number of users and expected workload,
- system response times,
- availability and required operating hours,
- authentication and authorisation rules,
- logging of user activities,
- security and data protection requirements,
- backup procedures,
- disaster recovery,
- data retention and archiving,
- accessibility for users with specific needs,
- integration monitoring,
- test and production environments,
- rules for updating and maintaining the solution.
If these requirements are only raised immediately before acceptance, they may require changes to the architecture, infrastructure or way the system operates.
Roles, responsibilities and project decisions
Even the best documentation cannot replace clear decision ownership. The project should define roles on both the organisation’s and the implementation partner’s side.
It should be clear:
- who approves the target process,
- who accepts the requirements,
- who makes scope decisions,
- who provides data and materials,
- who is responsible for configuration, integration and migration,
- who prepares and executes the tests,
- who accepts the final result,
- how disagreements are resolved,
- how scope changes are managed.
Without a clear decision owner, workshops end with a list of unresolved issues. The implementation partner either makes its own assumptions or pauses the work, and the project loses time.
What should the implementation partner receive?
The implementation partner does not always need to receive one large document. A linked set of materials that can be updated throughout the project is often more practical.
Depending on the scale of the implementation, these may include:
- a description of the project’s objectives and scope,
- a list of stakeholders and process owners,
- AS-IS process maps,
- TO-BE process maps,
- a catalogue of business problems and needs,
- a list of functional requirements,
- non-functional requirements,
- a description of roles and permissions,
- a catalogue of data and information sources,
- a description of integrations and communication flows,
- data migration assumptions,
- business rules and exception handling,
- use cases,
- test scenarios,
- acceptance criteria,
- a pilot and rollout plan,
- a register of risks, assumptions and project decisions.
The materials should be tailored to the way the project will be delivered. Documentation for purchasing an off-the-shelf product will look different from documentation for system configuration, and different again from documentation for developing a custom application.
Requirements must lead to testing and acceptance
A requirement that cannot be verified will be difficult to accept objectively. This is why the analysis should already define how the operation of the solution will be verified.
Every key requirement should lead to a test scenario and an acceptance criterion.
An example chain might look like this:
Business objective:
Reduce request processing time and provide visibility of the current status.
Process:
Submit request → approval → budget check → transfer to ERP.
Requirement:
The system selects the approval path based on the value of the request.
Test:
The user submits two requests with different values.
Expected result:
Each request is routed through the appropriate approval path.
Acceptance criterion:
For all agreed thresholds, the system correctly selects the required approvers.
This approach also helps when changes occur. If a new requirement is introduced, it is possible to determine which objective it supports, which processes it changes and which tests need to be updated.
Facing a similar challenge and want to bring it under control?
A pilot instead of one large go-live
In larger projects, the analysis should define a reasonable scope for the first go-live. Attempting to implement every process, integration and user group at the same time increases risk.
A pilot may cover:
- one representative process,
- a selected organisational unit or location,
- a limited group of users,
- the most important integrations,
- the complete path from the beginning of the process to its completion.
The pilot should have clearly defined completion criteria. Simply launching the system does not mean that the solution is ready to be rolled out across the entire organisation.
After the pilot, the organisation can assess:
- whether the target process is practical,
- whether the requirements were complete,
- which exceptions emerged during real-world use,
- whether the integrations operate reliably,
- whether users understand the new rules,
- how much effort the subsequent stages are likely to require.
Common mistakes in pre-implementation analysis
An analysis may fail to fulfil its purpose if it is treated as a formality. Common problems include:
- starting with a presentation of the selected product’s functionality,
- having no clear business objective,
- speaking only with management or only with end users,
- documenting the official procedure instead of the way work is actually performed,
- transferring the existing process into the new system without questioning it,
- failing to decide which systems own which data,
- writing vague requirements that cannot be tested,
- ignoring non-functional requirements,
- failing to define errors, exceptions and retries,
- having no decision owners,
- creating hundreds of diagrams without a clearly defined purpose,
- failing to link requirements with testing and acceptance,
- assuming that all details will be agreed during configuration.
The greatest risk is not the lack of extremely detailed documentation. It is the lack of a shared understanding of the process, scope and responsibilities.
Analysis for the organisation and for the implementation partner
A pre-implementation analysis may be useful both to the organisation purchasing the system and to the company responsible for delivering the implementation.
Support for the organisation
For the organisation, the analysis helps define the scope, structure its needs and engage with vendors from an informed position. It can provide a basis for an RFP, solution selection, scope negotiations and subsequent acceptance of the delivered work.
Support for the implementation partner
An implementation company may understand the technology very well but still require support in analysing the client’s processes, facilitating workshops, preparing documentation and clarifying requirements.
A good analysis reduces the number of assumptions, improves estimation and helps identify elements that fall outside standard system functionality at an earlier stage.
Independent assessment of a difficult implementation
Analysis can also help when the project is already underway. In such situations, it is useful to distinguish between:
- system defects,
- configuration gaps,
- unimplemented requirements,
- needs that were not previously documented,
- scope changes,
- problems resulting from the organisation’s existing process.
The result may be a recovery plan covering priorities, responsibilities, decisions and the sequence of further work.
Minimum and extended scope of analysis
The scope of the analysis should be proportionate to the project. Not every organisation needs a complete process catalogue and extensive documentation from the outset.
| Minimum scope | Extended scope |
|---|---|
| Project objective and scope | Programme or project charter |
| One or several key AS-IS and TO-BE processes | Process and dependency catalogue |
| List of core requirements | Complete catalogue of functional and non-functional requirements |
| Description of the most important integrations | Specifications of flows, data, statuses and errors |
| Test scenarios for the critical path | Complete test plan and traceability matrix |
| Acceptance criteria for the first stage | Acceptance criteria for stages, pilot and the complete solution |
| List of risks and decisions | Register of risks, assumptions, dependencies and changes |
In many cases, a good approach is to begin with a limited analytical phase. This makes it possible to assess the actual complexity of the project and decide which areas require further detailed analysis.
How can LISNET help?
At LISNET, I can support an organisation or implementation company in preparing and carrying out a pre-implementation analysis for an IT system.
The scope of cooperation may include:
- structuring the project objective and scope,
- identifying stakeholders and process owners,
- preparing and facilitating workshops,
- mapping AS-IS processes,
- designing TO-BE processes,
- preparing functional and non-functional requirements,
- describing data, statuses, roles and business rules,
- analysing integrations and information flows between systems,
- preparing test scenarios and acceptance criteria,
- preparing materials for the implementation partner,
- supporting the implementation partner in clarifying client-side processes,
- preparing a pilot and rollout plan,
- providing analytical support during implementation, testing and acceptance,
- assessing projects affected by scope or cooperation problems.
I do not replace the system vendor or the organisation’s domain specialists. I can, however, connect their knowledge with process and systems analysis and prepare materials that help the project progress more effectively.
The engagement may result in a limited analysis of a single process, preparation of a scope for an implementation partner, a pilot in a selected area or longer-term support for a larger implementation programme.
Summary
A pre-implementation analysis is not an additional stage that merely delays the start of the project. Its purpose is to reduce uncertainty before costly decisions are made.
The organisation should understand what problem it is solving, how the current and target processes work, what data is required, which systems participate in the solution and who is responsible for individual decisions.
The implementation partner should receive a scope that can be estimated, requirements that can be implemented and scenarios that make it possible to verify the result.
Only by combining these perspectives can the organisation responsibly select a system, prepare the configuration, plan the integrations and begin implementation.
A good pre-implementation analysis does not guarantee that no changes will arise during the project. It does, however, make it possible to assess those changes consciously instead of discovering fundamental assumptions only during system acceptance.